The Building Approval (BA) process is generally coordinated and issued by a private building certifier.
However, obtaining BA usually involves multiple parties working together, including:
- Building designers or architects
- Structural engineers
- Energy assessors
- Hydraulic or drainage consultants
- Surveyors
- Builders
- Specialist consultants where required
The certifier reviews the documentation to ensure the project complies with:
- The National Construction Code (NCC)
- Australian Standards
- Structural requirements
- Safety and construction regulations
The certifier does not usually design the project themselves. Instead, they assess and approve the documentation prepared by the project team.
Typical responsibilities during BA
- Designers/architects prepare architectural plans
- Engineers prepare structural documentation
- Energy assessors prepare EER documentation
- Consultants prepare specialist reports where required
- The certifier reviews and approves the documentation
- The builder may provide construction-related information or clarifications
Important to understand
A Building Approval is not simply an administrative sign-off.
It is a technical assessment process that confirms the project is suitable, compliant, and safe to construct.
For this reason, coordination between the design team, consultants, and certifier is critical to avoid:
- Approval delays
- Compliance issues
- Construction variations
- Unexpected costs
- Redesign during construction