When will we need building approval?
What the law says
Building approval (BA) is approval of the detailed building work. It is set out in division 3.3 of the Building Act 2004 (A2004-11), sections 26 to 30A. A licensed building certifier assesses it against the National Construction Code and the Act. The BA is issued to you as the landowner, and you appoint the certifier.
BA is separate from development approval (DA). DA is the planning approval under the Planning Act 2023 (A2023-18). It looks at things like setbacks, height and the effect on neighbours. BA checks that the building can be built safely and meets the building rules. A DA does not give you a BA, and where both apply you need both.
In practice, you will need building approval in these cases:
A Secondary Residence always needs a DA, and it also needs a BA. Any building people can live in needs a BA.
An extension, attached or detached, can be exempt from DA if it meets every planning exemption rule. It still needs a BA. If it cannot meet those rules, it needs a DA as well.
Class 10a buildings such as garages, sheds and carports are typically exempt from BA if they meet certain size requirements. Whether yours qualifies depends on its size and position, so it needs to be checked first.
Some other building work does not need a BA. For example, demolition is BA-exempt where the building would be exempt if it were built today and the other general exemption rules are met. Like-for-like internal renovations do not normally need a BA, but changes to structure or drainage can change the answer.
Whether work is exempt from BA depends on the building exemption rules, not the planning exemption rules. Being exempt from DA does not make work exempt from BA.
How we do it
We manage the approvals process for you. Most projects we do need a BA. Where a DA is needed, the DA comes first and the BA follows. In practice it runs like this:
1. A licensed building surveyor is appointed as your certifier.
2. Building approval is applied for, with the required fees. Our 10% project deposit and planning payment covers the required development and building approval costs.
3. A licensed builder is appointed and the building commencement notice is obtained.
4. Construction starts once the commencement notice has been issued.
The certifier is usually a private certifier. They check the plans and reports prepared by the design team independently. Tell us what you plan to build and we will check whether it needs building approval.