Questions & Answers › Getting started with us
What will the total cost of the extension be?
We can't give you a total for your extension until it has been designed for your block. There is no single price for an extension, and we don't publish a general price range for extensions. What we can promise is that you will see the full price in writing, as a fixed price, before you decide whether to build.
How we get to your total price
Design. The design service costs $3,500 including GST. If you choose to build with us within 60 days of your project proposal date, we absorb that fee.
Estimates during design. After the first draft plans, we start giving you estimates for the building work and the siteworks, so you can see whether the design is on track for your budget. If the estimate is over your budget, we look at changes to the design or scope with you and explain the trade-offs.
Fixed price. Once you approve your final floor plans, we prepare your detailed fixed price.
What makes up the total
Your fixed price can have up to three parts:
a Project Proposal, for the new extension itself
a Site Scope Proposal, for site-specific work such as demolition, earthworks and service connections
a Renovation Proposal, only if you also want agreed work done to your existing home
For an attached extension, the work to join the new building to your existing house is included. That covers the structure, roofing, weatherproofing, demolition and making good, plastering, painting, and moving services where needed.
The planning and building approvals the ACT Government requires are included in your fixed price. They are not charged as a separate extra. You pay for them through the first two project payments, the 5% deposit and the 5% Planning Approvals payment.
What can change the final amount
Your choices against allowances. The price includes allowances for items such as tapware, tiles, appliances and flooring. These are set out in a Prime Cost Allowance Schedule. If you choose items that cost more than the allowance, you pay the difference. If you choose items that cost less, the price comes down.
Changes you ask for after signing. These are handled as variations, and you sign off on the cost before the work starts.
Items that can't be priced up front. An example is a power meter upgrade, which depends on what Evoenergy requires.
Things the contract does not cover. These include digging out rock and removing asbestos. They are rare, but they are paid by the owner if they come up.
Additional reports or ACT Government applications. Fewer than 20% of projects need these. We explain which ones you need and what they cost, and get your agreement before we go ahead.
The quickest way to get a realistic figure for your property is to talk to us about your plans and budget. Call 1300 979 658 or email info@cgfb.com.au.
What the law says about rules that can affect the cost
Approval pathway. An extension that fully complies with the Planning (Exempt Development) Regulation 2023 (SL2023-21) usually needs only a Building Approval. If it doesn't comply, it may also need a Development Approval.
Water saving. Under specification 19.5 of the Planning (Residential Zones) Technical Specifications 2026 (NI2026-303), extensions and alterations need a water-saving measure. The two exceptions are an extension of 50% or less of the existing gross floor area, and work where no new plumbing is proposed. Where the rule applies, you must meet one of three options: a rainwater tank (or WELS-rated fixtures on compact blocks), a greywater system, or evidence of a 40% reduction in mains water use compared with an equivalent development built in 2003.
CGFB-Q-0811 · last reviewed 24 November 2026