Questions & Answers › Approvals and planning rules
What steps need to be taken if I do want dual occupancy?
What the law says
A dual occupancy is two dwellings on a block that was originally used or leased for a single dwelling. It is a type of multi-unit housing, so a development of two or more dwellings follows the multi-unit housing requirements (Territory Plan 2023, NI2023-540, Part G Dictionary; Planning (Residential Zones) Technical Specifications 2026, NI2026-303, spec 4.2).
Check your Crown lease. The lease sets what the land can be used for and may say how many dwellings are allowed. If it does not allow the second dwelling, you need to vary it. If it says nothing about the number of dwellings and you want to unit title, you need to vary it to state a number. The variation can be part of the same DA as the building work (Planning Act 2023, A2023-18). A Lease Variation Charge (LVC) may apply. It is not automatic, and depends on whether a chargeable variation is needed. The Crown lease is not varied until the charge is paid. If the charge is over $50,000 it can be deferred, but interest applies. If you want to unit title later, the lease should also have at least 50 years left to run.
Plans for the new dwelling and DA approval. You need a Development Application (DA) with a full set of drawings and a Development Outcomes Report. Where a design guide applies, such as the Planning (Missing Middle Housing) Design Guide 2026 (NI2026-312), you also need a Design Response. ACT Planning assesses the DA against the Territory Plan 2023 (NI2023-540).
Building approval and construction. DA approval does not mean you can build yet. You still need building approval before construction starts.
Certificate of Occupancy and Use. Each dwelling needs its own certificate once it is built.
You can stop here if you are happy for both dwellings to stay on one title. The steps below only apply if you want to sell the dwellings separately.
Extra rules for separate titles. Unit titling is done under the Unit Titles Act 2001 (A2001-16) and the Subdivision Policy in the Territory Plan 2023 (NI2023-540, Part F01). In RZ1, subdivision of multi-unit housing under the Unit Titles Act is permitted where all dwellings have been lawfully built and one of these applies: the block is a standard block of at least 600m², or it is a non-standard block. In RZ1, staged unit title development is not permitted for fewer than five units, so a dual occupancy is un-staged. A Secondary Residence cannot be given its own title, so it must be approved as a dual occupancy from the start.
Prepare the unit title application. The applicant provides in writing:
details of the parcel of land to be subdivided
details of who is applying
class of units (A or B), un-staged
commencement and completion dates
the relevant DA approval
a signature
A unit title assessor can be the lessee, a developer or a solicitor on behalf of the lessee. There must be at least two units and some common property, such as a shared driveway. Each unit needs its own electricity and water meter.
Submit the application to EPSDD. The application can be lodged before the dwellings are finished. The Certificate of Occupancy and Use for each dwelling must be supplied before approval.
Register the Units Plan at the Land Titles Office. A separate title is then created for each unit, and each unit can be sold on its own.
How we work
We also get a survey of the property early. A surveyor checks boundaries, levels, site conditions and any easements or services. Your designer uses it to prepare the plans.
You do not have to engage a planner before designing. But getting planning advice first can save time and redesign. Our planning team can review your Crown lease, zoning, block size, Territory Plan requirements and site constraints before design starts, so the designer knows what can realistically be built on your block.
Source: ACT Planning, Guide to the unit title application process
CGFB-Q-0721 · last reviewed 24 November 2026