What is the process of getting driveway approval?
A new driveway or verge crossing needs its own driveway approval from Transport Canberra and City Services (TCCS). A Building Approval does not approve the driveway, even if your BA drawings are stamped.
Currently the process is to complete the TCCS online form here: https://form.act.gov.au/smartforms/servlet/SmartForm.html?formCode=1050
Select yes to driveway. Select no to all questions under stormwater, waste or LMPP (Landscape Management and Protection Plan) unless you also require TCCS approval for those.
You will need these documents:
1. A site plan. It must show the location of the proposed driveway, its distance from anything located on the verge, and the width of the driveway. If there is a new Secondary Residence, the site plan shows it as well as the driveway. If only a new driveway is proposed, show just the driveway proposal.
2. A Landscape Management and Protection Plan (LMPP) showing how the Territory's assets on the verge will be protected during construction. These typically include trees, grass, footpaths, kerb and gutter, street lighting and stormwater sumps.
3. A dilapidation report. This would normally have been created at the DA stage. If it was not, it needs to be created before you submit the driveway form.