What the law says
Common property is the shared part of a units plan, such as shared driveways, paths and other shared spaces. After unit titling it is owned collectively by the unit owners, and the owners corporation manages it for them (Unit Titles Act 2001, s 13). The registered units plan shows what is common property and what belongs to your unit.
Your unit is either class A or class B. A class A unit is defined by its floors, walls and ceilings. In a class A unit, the external part of a wall that does not adjoin another unit, and the roof, are usually common property. The owners corporation must also maintain load-bearing walls, columns, footings, slabs and beams. A class B unit is unlimited in height, and the owner is responsible for the buildings and property within the unit boundary. If you are not sure which you own, check your certificate of title or the units plan.
Planning approval and building approval are two separate things. Under the Planning (Exempt Development) Regulation 2023 (SL2023-21), sch 1, s 1.20, an internal alteration of a building can be exempt from development approval. It must not change the building's class under the building code, and it must meet the general exemption criteria, such as not being inconsistent with the lease and not affecting heritage-registered places. Section 1.6 says an exemption does not affect other laws, including the Building Act 2004 (A2004-11). Building Approval is assessed under that Act, usually by a private building certifier. Whether your particular work needs one depends on the building exemption rules, not the planning ones.
_____
How we suggest you go about it
1. Read your registered units plan and mark what is common property. Check the registered rules of your complex as well. Some rules require written consent before alterations or additions.
2. Contact the Manager of the complex before you finalise plans. They know the owners corporation's requirements.
3. Ask the owners corporation for approval where the work goes beyond like-for-like. If you are only replacing a kitchen and not changing the drainage points, approval may not be needed. Confirm this with the Manager first. If you want to move the sink and a new drainage point has to be cored into the slab, ask for approval before the work starts. If you are in a high-rise building and want to add a bathtub, that adds weight to the slab. You will need permission, and you will probably need a structural engineer to confirm in writing that the slab can carry the load. Any change that affects the outward appearance of the unit also needs owners corporation approval under your complex's rules.
4. Check with a building certifier whether your work needs Building Approval. Like-for-like internal renovations do not normally need it, but changes to structure or drainage can change the answer.
5. Tell the Manager before work starts, because noise from major works will affect neighbours. The Manager can let them know.
6. If there is a dispute about who owns or is responsible for part of the property, get independent legal advice.
CGFB-Q-0596 · last reviewed 24 November 2026