What is the allowable width for the primary driveway on a verge (public land)?
The allowable width depends on your block size and on where you measure it along the crossing. The crossing is the part of your driveway over the verge, which is public land between your boundary and the kerb.
What the law says
Under the Planning (Residential Zones) Technical Specifications 2026 (NI2026-303), specification 27.10, a block must have at least one verge crossing and no more than two. All verge crossings must comply with the applicable design standards and approval requirements. Redundant crossings must be removed and the verge and kerb restored. Every new or changed crossing, including a second driveway, must be endorsed by the City and Environment Directorate (or its future equivalent). Specification 27.4 says crossings must be designed to be used safely by pedestrians, cyclists and vehicles. Specification 27.8 says driveways must meet AS 2890.1, the Australian Standard for parking facilities.
The specifications do not set a width for the crossing. The widths come from the driveway design standards we work to.
_____
The widths we design to
For large and mid-sized blocks, the crossing is at least 5m wide at the kerb and at most 5.5m wide at the kerb. It is at least 3m wide at the front boundary, and it cannot be wider at the boundary than at the kerb.
For compact blocks, the crossing is 3m wide at the front street boundary.
Other points we check on the crossing
1.2m clear of stormwater sumps and other services.
1.5m clear of transformers, bus stops and public light poles.
6m clear of the tangent point on a corner block. Roundabouts and signalised intersections need separate formal approval.
An uphill grade of less than 17% and a downhill grade of less than 12%, measured from the kerb.
A right angle to the kerb line, with a maximum deviation of 1 in 10.
Outside the drip line of mature trees, and at least 3m clear of small and new street trees.
Sightlines and cross fall that meet AS 2890.1.
If there is a public footpath across the crossing, the footpath stays continuous and takes precedence over the driveway. If an existing footpath is replaced, it is built at the same level, in the same material and colour as the original.
Approval
A new or changed driveway needs approval from Transport Canberra and City Services (TCCS). Stamped Building Approval drawings do not mean the driveway is approved. We check the width for your block at design stage, so the driveway is compliant before you lodge.
CGFB-Q-0445 · last reviewed 24 November 2026