Questions & Answers › Approvals and planning rules
What is development approval, and will my project require it?
What the law says
A development approval (DA) is the planning approval. It is made under the Planning Act 2023 (A2023-18). The Territory Planning Authority assesses whether your project is allowed on your block and meets the planning rules in the Territory Plan 2023 (NI2023-540). These cover things like setbacks, building height, tree protection, parking and access, solar access and neighbour impacts.
Some work does not need a DA. This is called exempt development, and the rules are in the Planning (Exempt Development) Regulation 2023 (SL2023-21). Under section 1.130, you can build or alter a single dwelling in a residential zone without a DA if all of these apply:
- it will be the only dwelling on the block;
- it complies with the Single Dwelling Housing Development Control (the version in force today is NI2025-492), together with the relevant District Controls; and
- you have given the required written information to your adjoining neighbours.
It must also meet the general exemption criteria in section 1.10. These include:
- staying clear of easements and utility access spaces;
- complying with the heritage, tree and environment laws;
- not being inconsistent with your lease;
- not increasing the number of dwellings on the block to two or more; and
- meeting the mandatory matters control.
So, in practice:
- A Secondary Residence always needs a DA.
- An extension, attached or detached, does not need a DA if it meets all of the rules above. It then only needs a building approval (BA).
- If an extension cannot meet every rule, it needs a DA. The exception is a minor non-compliance. The Territory Planning Authority can make an exemption declaration under sections 1.19B and 1.19C, so the work stays exempt. It can do this only if the breach is minor and does not adversely affect anyone else.
- An extension to a duplex needs a DA even if it complies.
- A detached addition that looks like a separate dwelling must be approved as a Secondary Residence, and that needs a DA.
- If your project needs a Crown lease variation, it needs a DA, whatever the project type.
A DA is not a building approval. Building approval is a separate approval under the Building Act 2004 (A2004-11). It checks that the work can be built to the National Construction Code. Getting a DA, or being exempt from one, does not mean you can start building. You still need a BA before construction begins, unless the work is itself exempt from BA.
How we do it
We check your design against the exemption rules before it is designed too far. If it fully complies, we take it straight to a private building certifier for the BA. If there is one minor breach, we seek an exemption declaration first. If the breach is not minor, or there is more than one, we lodge a DA. For a Secondary Residence, we prepare and lodge the DA for you. The BA follows once the DA is approved.
CGFB-Q-0828 · last reviewed 24 November 2026