What is a site cut? What is a site cut and fill?
A site cut is digging soil and earth away to lower the ground and make a new finished ground level. The soil may be taken away from the site.
Fill is adding soil to raise the ground. Site cut and fill is when the material is not removed from site, but moved around on it. Soil dug from one part of the block is used to build up another part.
What the law says. The Planning (Residential Zones) Technical Specifications 2026 (NI2026-303), specification 22.1, is a benchmark for cut and fill. It says the total change in ground level from cut or fill must not exceed 1.5m within 1.5m of a side or rear boundary. The change in level is the total of all level changes within 1.5m of the boundary, measured from datum ground level to the new finished ground level. The rule does not include a cut associated with a basement.
How we do it. Site cut and fill, and retaining walls, are part of site preparation. This is extra time on top of the build itself, along with demolition, disconnections and rerouting of services.
CGFB-Q-0374 · last reviewed 24 November 2026
Related questions
- Can we get other trades in to finish certain aspects of the project?
- Do you get a second set of bins after completing a Secondary Residence project ?
- Can CGFB remove a section of a primary residence and re-do the wall in order to make room for a Secondary Residence?
- Can we provide any of our own materials for the project?