Questions & Answers › Approvals and planning rules
what height and width is required for access to easements on a block?
What the planning rules say
The Planning (Residential Zones) Technical Specifications 2026 (NI2026-303) do not set an access width or height for easements. Specification 29.1 requires that the development can be serviced. It also requires endorsement from the relevant utility providers (electricity, water, gas, sewerage and stormwater). They confirm that earthworks, utility connections, buildings, pavements and landscape features comply with utility standards, access provisions and asset clearance zones. The specifications do not create easements. They only require that existing services are taken into account.
The access figures below come from the utility owners, not from the specifications. Each utility sets its own requirements. A new dwelling or building is not permitted within a stormwater easement.
How we work with the utility owners
First we work out which easements are on your block and who owns each one. Each owner has its own access requirement. The figures below are what the owners currently suggest as a guide. On earlier projects we have obtained approval with less access, but that is the owner's decision each time and is not guaranteed. Do not design to less than these figures unless the owner has agreed in writing.
Electricity easement - Evoenergy
Evoenergy suggests a clear, unobstructed machinery access 1.5m wide and at least 2.4m high to any pole location on your block. We show this access on the site plan.
Stormwater easement - TCCS
In new suburbs, access is along the easement itself. These are suburbs recently approved under estate development plans, which have removable panels along the rear boundary fences so that Transport Canberra can reach the easement. Elsewhere, access of 2.5m x 2.5m is usually required.
Sewerage easement - Icon Water
The access needed depends on how deep the sewer pipe is:
Pipe less than 2.2m deep: a path 1.8m wide with 2.65m height clearance.
Pipe 2.2m to 3.0m deep: a path 2.5m wide with 2.85m height clearance.
Pipe deeper than 3.0m: assessed individually by Icon Water.
Most developments need between 1.8m and 2.5m. Icon Water's approval is separate from Development Approval, so we check the access with Icon Water early in design.
CGFB-Q-0281 · last reviewed 24 November 2026