Questions & Answers › Getting started with us
What approvals do I need to build a Secondary Residence in Canberra?
A Secondary Residence in the ACT needs two separate approvals: Development Approval (DA) first, then Building Approval (BA). A Secondary Residence always needs a DA. It cannot go straight to a building certifier.
What the law says
Development Approval (DA) is the planning approval. It is assessed by the Territory Planning Authority under the Planning Act 2023 (A2023-18). The assessment outcomes it is measured against are in the Territory Plan 2023 (NI2023-540). For a residential zone, the Planning (Residential Zones) Technical Specifications 2026 (NI2026-303) can be used as a benchmark to show the outcomes are met. They are a possible solution, not a mandatory checklist. Under NI2026-303, spec 4.2, a Secondary Residence meets the requirements for a single dwelling.
Some DA matters are flexible and some are not. Assessment Outcomes are met by showing the design achieves the outcome. Assessment Requirements, such as site coverage, are mandatory. The DA looks at the position and size of the build on the block and how it affects the streetscape.
Building Approval (BA) is the construction approval. It is assessed by the certifier you nominate, against the National Construction Code and the Building Act 2004 (A2004-11). It looks at the detail of how the building is made. This includes engineering, the energy efficiency rating and livable housing requirements.
_______________
How we handle it
We manage both approvals for you. In most residential projects the DA comes first and the BA follows. A DA does not guarantee that the project is ready to build, because engineering or code compliance can still require changes before BA is issued. For that reason we consider both approvals early in the design.
CGFB-Q-0847 · last reviewed 24 November 2026
