How long will planning approval take?
For a Secondary Residence, planning approvals generally take 8 to 10 months overall. That covers everything from preparing the application to having your approvals in hand. Only part of that is the government's formal assessment.
What the law says
A Secondary Residence always needs Development Approval (DA). It cannot go straight to a building certifier. Under the Planning Act 2023 (A2023-18), the legal timeframe for the assessment stage of a DA is:
- 30 working days if no neighbour makes a representation (an objection or comment)
- an extra 15 working days if a representation is received
That is the assessment period only, not the whole journey. Working days leave out weekends and public holidays, so 30 working days is roughly six weeks or more on the calendar.
The DA is only lodged after a completeness check, which can take up to 10 working days. Every DA is then publicly notified, and neighbours generally have 15 working days to make a representation (Planning (General) Regulation 2023, SL2023-20, s 36). Time taken to answer a request for further information does not count towards the legal assessment period.
Building Approval has no legislated timeframe, so how long it takes varies. In most cases the DA comes first and Building Approval from a private building certifier follows before construction can start.
Some things add steps. If your block is registered or provisionally registered on the ACT Heritage Register, the development must be endorsed by the ACT Heritage Council (Planning (Residential Zones) Technical Specifications 2026, NI2026-303, specification 23.2). If your Crown lease needs varying, that is done through a DA and a Lease Variation Charge is payable. The lease is not varied until the charge is paid.
Extensions
An extension to a single dwelling, attached or detached, usually needs only Building Approval from a certifier, not a DA. This applies if it complies with every control in the exempt development rules made under the Planning Act 2023. Those rules are in sections 1.130 and 1.131 of the Planning (Exempt Development) Regulation 2023 (SL2023-21). Section 1.131 covers a single minor breach, where an exemption declaration can be sought instead of a DA. If an extension cannot comply, or needs a lease variation, it needs a DA and the timeframes above apply.
How we find it works in practice
Overall, planning approvals for a Secondary Residence generally take 8 to 10 months. The DA assessment itself realistically takes 40 to 50 working days. The rest of the time goes on the steps around it:
- Preparing the application. The plans and supporting documents are finalised and lodged, including a current contour and detail survey.
- The completeness check and public notification.
- Referrals to bodies such as Icon Water, Evoenergy and Transport Canberra and City Services.
- Requests for further information, and the time it takes to answer them.
- Building Approval afterwards.
These things can make it quicker or slower:
- A design that fully meets the Territory Plan rules usually moves more smoothly than one that relies on arguing against criteria.
- A neighbour representation adds 15 working days to the assessment period.
- Heritage listing, protected trees, easements, a second driveway or moving power or water services can add time.
- Whether your Crown lease needs varying.
Your Customer Designer can tell you which path your project is on once the design is underway.