How long does the renovation design process normally take?
Renovation designs usually take between 4-8 weeks, depending on the complexity of your project. These timelines are based on the availability of the customer to meet and provide feedback.
The process starts with an initial meeting at your residence (if possible). Over the following weeks, we meet with you in our office to refine and review the floor plan, snapshot and elevations until you are entirely happy with the layout and design.
The process can take longer if we seek certain approvals during design, such as tree removal or a second driveway approval. These decisions may determine where the building can sit or how the property is accessed, so we may need the outcome before finalising parts of your design. Your specialist Customer Designer will explain this and keep you informed.
CGFB-Q-0557 · last reviewed 21 November 2026
Related questions
- When fire resistant walls are needed, such as when building within 1.8 metres of an external wall on the block, where is this marked on the plans? Does this also incur additional costs for the customer?
- Can we change from a modification design to a custom design during the design process?
- Can you terminate the design process?
- Why are the follow-up design meetings held online or at your office?