How are you able to offer a Fixed Price Agreement when many builders can’t?
We can offer a fixed price because we design and price your project before you sign, rather than after construction has started.
How we get to a fixed price
We spend more time on design up front. After you approve your final floor plans, we prepare your fixed price. It is made up of three parts:
- Build: the full turnkey construction, with the inclusions, finishes and fixtures set out in your Project Proposal.
- Planning: the fees and approvals, including ACT Government fees, home warranty and required insurances, engineering, plans, certifications and building approvals.
- Site and utilities: the site-specific work and service connections, set out in your Site Scope Proposal.
These documents form the basis of your Fixed Price HIA agreement. Because the design, approvals and site work are resolved first, the price reflects what is known at that point.
Allowances for your inclusions
For items you have not chosen yet, such as tapware, tiles, appliances and flooring, your contract includes a Prime Cost Allowance Schedule. We finalise your selections with you at the inclusions stage, and an inclusions coordinator helps you at no cost. If you choose something that costs more or less than the allowance, the price is adjusted by the difference. We add no margin to these items.
What this means for you
Once we present your fixed price agreement, the price is locked in. It can change only in these situations:
- you ask for a variation that changes the agreed scope
- you delay the project
- Prime Cost items are adjusted
- a government or other entity's document, such as Dial Before You Dig, a plumbing tie search or sewerage plans, turns out to contain an error we could not have foreseen
- soil or ground conditions differ from what was expected (the risk is low where no major excavation is needed)
A few items cannot be priced until an outside authority has decided. A power meter upgrade is one example, because the cost depends on what Evoenergy requires. We tell you about these before you sign. The full terms are in your HIA agreement and your Customer Project Proposal.