Questions & Answers › Getting started with us
Are there any hidden costs associated with unit titling or lease variation? Are there additional fees beyond the government charges that I should be aware of?
Yes. Beyond the Lease Variation Charge, there are usually several professional fees and ongoing costs that people do not expect. None of them are secret, but they are easy to miss because they are paid to different people at different times. Below is what the law and the approval process can add. We have not listed amounts we cannot verify. Ask each provider for a quote.
Professional fees you are likely to pay
- Valuer (only in some cases). If your lease variation is a section 332 non-standard chargeable variation, the charge is 75% of the change in value. That DA must be supported by a full valuation report and a valuation certificate from an accredited valuer showing the before and after values. This happens, for example, where your suburb is not listed in the Planning (Lease Variation Charges) Determination. You pay the valuer separately.
- Surveyor and units plan. To unit title, a units plan has to be prepared and registered under the Unit Titles Act 2001. This is surveying work and is separate from the contour and detail survey used for design.
- Unit title assessor and legal costs. The unit title application needs a unit title assessor. You will probably also want a solicitor to handle the registration and set up the owners corporation rules. Selling a unit later means conveyancing costs as well.
- Government registration fees. Lodging and registering the units plan and related documents with ACT Land Titles attracts fees. These are set each financial year, so check the current ACT fees determination before budgeting.
Costs that depend on your lease and block
- Further Crown lease. Unit titling needs at least 50 years left on the Crown lease. If you have less, you must apply for a further lease. The application fee was $500.30 in 2024-25, and the further lease itself may carry other costs.
- Interest if you defer the charge. If your Lease Variation Charge is over $50,000, you can defer it through the Lease Variation Charge Deferred Payment Scheme. Interest applies, and the charge must be paid at settlement if you sell.
Building requirements that add cost
- Water metering. Separate unit metering under a single service tie is mandatory under the Utilities (Technical Regulation) (Water and Sewerage Code) Approval 2024. Icon Water may also assess a fee under its capital contributions code.
- Parking. A dual occupancy may need a visitor space. One space per dwelling must also be EV ready, meaning the infrastructure for a charger is in place.
- Adaptable housing. Dual occupancies are multi-unit housing, so the AS 4299 adaptable housing requirement can apply. If your existing house does not comply, the new dwelling may need to.
- Energy rating. Both dwellings must meet the minimum energy efficiency rating to be separately titled.
Ongoing costs after titling
- Owners corporation. Once the units plan is registered, an owners corporation exists under the Unit Titles (Management) Act 2011. That brings obligations such as insuring the buildings and contributing to the administrative and sinking funds, even with only two units.
- Tax. Rental income is assessable income. Land tax applies to residential property that is rented out. Capital gains tax may apply when you sell a unit that is not your main residence. Talk to your accountant.
What is in our price
Our published position is that we absorb the cost of obtaining the planning and building approvals required by the ACT Government. Your fixed price is set out in your Project Proposal and Site Scope Proposal. The Lease Variation Charge, valuer, unit title assessor, solicitor and Land Titles fees are separate from building approvals. Please ask us to confirm in writing which, if any, of these items appear in your proposal before you sign.
CGFB-Q-0777 · last reviewed 24 November 2026
